- ホーム
- > 洋書
- > 英文書
- > Science / Mathematics
Full Description
This study book covers the following topics on installation and Commissioning: supply, overcurrent and earth fault protection, the electrical information required, selection of conductor size, selection of cable and protective conductors, preparting for commissioning, testing, alarm systems, and fault location.
Stage 1 Design also includes a circuit design project. Circuit 1 has been completed to aid students in completing circuits 2, 3 and 4 at the relevant stages in the book. Self-assessment questions and an end test are included so that progress can be monitored.
The intermediate Course books cover the knowledge requirements for the City & Guilds of London Institute 2360 Electrical Installation Scheme, Part 2 and NVQ level 3.
Contents
About this book
Electrical Installation Series Titles
Acknowledgments
Study Guides
1 SUPPLY AND PROTECTION
Part 1
Part 2
Part 3
Part 4
2 OVERCURRENT AND EARTH FAULT PROTECTION
Part 1
Part 2
Part 3
3 ELECTRICAL INFORMATION REQUIRED
Part 1
Part
Introduction to the project
4 SELECTING THE CONDUCTOR SIZE
Part 1
Part 2
Project
5 SELECTING THE CABLE
Part 1
Project
6 SELECTION OF PROTECTIVE CONDUCTORS
Part 1
Part 2
Project
7 PREPARING FOR COMMISSIONING
Part 1
Project
8 TESTING
Part 1
Part 2
Part 3
Part 4
Part 5
Project
9 ALARM SYSTEMS AND FAULT LOCATION
Part 1
Part 2
Fault Location
End Test
Answers
Appendix
Introduction
CT Manufacturing Ltd.