プロジェクト管理の要点(第2版)<br>The Essentials of Project Management (2 SUB)

プロジェクト管理の要点(第2版)
The Essentials of Project Management (2 SUB)

  • ただいまウェブストアではご注文を受け付けておりません。 ⇒古書を探す
  • 製本 Paperback:紙装版/ペーパーバック版/ページ数 254 p.
  • 言語 ENG
  • 商品コード 9780566082245
  • DDC分類 658.404

Full Description


A primer distilled from the author's Project Management. It provides a straightforward account of the principles and techniques of project management, designed to meet the needs of the non-specialist. Using examples and illustrations, the author introduces key project management procedures.

Contents

Part 1 Introductionobjectives; the time/cost relationship; the Association for Project Management. Part 2 Definition: the customer's project specification; project scope; use of checklists; the constractor's initial design specification; specification of production methods; construction specification; specifications for product development projects; developing the project specification; projects which are difficult or impossible to define; reference. Part 3 Organization: effective organization and communications; project teams versus functional group or matrix organizations; functional matrix organizations; variations of the matrix organization; project team organization; which type of organization is best?; the hybrid option; organizations with more than one project manager; the project manager himself; project services group. Part 4 Work breakdown and coding: family tree hierarchy; work breakdown structures for large projects; coding systems; benefits of a logical coding system; choosing a coding system. Part 5 Cost estimating: cost format; estimatingaccuracy; classification of estimates according to confidence; standard tables; profit estimates; manufacturing estimates with no drawings; personal estimating characteristics; estimates for material and equipment costs; below-th-line costs; planning; bar charts; critical path networks; the different network notation systems; critical path networks using arrow diagrams; precedence diagrams; case study - the Gantry Project; level of detail in network diagrams; should a large network be broken down into smaller networks?; interface activities; milestones; is the predicted timescale too long?; early consideration ot resource constraints. (Part contents.)